Access requirements are work, not paperwork
An induction that takes two hours per person, repeated for every cleaner and every relief worker, is a real cost that has to sit somewhere. So does an annual renewal, a site-specific safety briefing, or a requirement that contractors sign in and out through a gatehouse that adds fifteen minutes to each end of a shift. None of these are unreasonable, and all of them belong in the scope so they can be priced honestly rather than absorbed and then quietly cut.
The scope should state the requirement, its frequency and who bears the cost. If the site provides the induction at no charge, the contractor still spends the time. If the site charges for passes, say so. Sites that document these requirements receive better-considered quotes, because a bidder can plan a workforce around them rather than discovering the constraints in their first week. It also reduces the risk of a provider withdrawing shortly after award once the true administrative load becomes apparent.