Common standards, separate schedules
Write the standards once at the front: reporting method, supervision expectations, screening and insurance requirements, incident escalation, consumable model and periodic review. These apply everywhere and do not need repeating. Then give each building its own area list, task schedule, frequency and service window, because those are properties of the building rather than of the portfolio. Anyone reading the document then finds the general rules in one place and their own building in another.
This structure makes the document shorter, not longer. It also makes it usable by the people on each site, who need their own schedule and rarely need the whole portfolio specification. When a new building joins, you add a schedule rather than rewrite a contract, and the standards section carries across untouched. The same applies when a site leaves the arrangement, which is rarely as tidy as adding one.
